Jannah Theme License is not validated, Go to the theme options page to validate the license, You need a single license for each domain name.
Business

United Lithium Corp. Begins Drilling at Kietyönmäki Lithium Project in Finland, Expands Land Position, The Canadian Business Journal

VANCOUVER, BC, September 14, 2022 (GLOBE NEWSWIRE) — United Lithium Corp. (CSE: ULTH; OTC: ULTHF; FWB: 0ULA) (“ULTH” or “Company) is pleased to announce that drilling has commenced at the Kietyönmäki Lithium Project (“Kietyönmäki” or “the Project”) in Finland. The average height is 100 m. The purpose of the drilling program is to confirm the current geological knowledge of the project and provide sufficient geological data to model over 500,000 tonnes of mineralized bodies with >1% Li grades .2O. If the drilling results are good, a 400 m follow-up drilling program can be started. The immediate surroundings of Kietyönmäki Li-pegmatite will be further investigated with a rock surface sampling program of 250 sample points.

Figure 1 Previous drilling and sampling in the area of ​​the main dike of the Kietyönmäki lithium project
https://www.globenewswire.com/NewsRoom/AttachmentNg/5990de60-01f7-40c5-8ac4-fa0b30cf8cdb

The company is also pleased to announce the addition of 535 hectares to its Kietyönmäki lithium project. This brings the total land area of ​​the project to 900 hectares.

Figure 2 Location of the Kietyönmäki project area
https://www.globenewswire.com/NewsRoom/AttachmentNg/650ad0d5-668e-448f-a4ce-5a9e80165181

Figure 3 Kietyönmäki Exploration Claims and Reservations
https://www.globenewswire.com/NewsRoom/AttachmentNg/9458667d-ed2a-4f51-b4f9-377abd4b7651

Figure 4 Predicted points for drill hole collar
https://www.globenewswire.com/NewsRoom/AttachmentNg/c82bb82a-8289-4930-b9cd-687c0d0670bf

In recent field work completed at Kietyönmäki, 45 bedrock and rock samples were selected for analysis. We will report the results as soon as they are completed.

Figure 5 Very localized pegmatite boulders
https://www.globenewswire.com/NewsRoom/AttachmentNg/65d95c91-db1d-407d-874c-09af8dc52deb

Figure 6 Pegmatite cutting host amphibolite at the Kietyönmäki lithium project
https://www.globenewswire.com/NewsRoom/AttachmentNg/f377ab40-3ff8-4f0b-906a-a3ccafc01313

The company is actively working on multiple potential lithium projects in both Europe and North America with the aim of becoming a long-term and sustainable supplier of lithium to the rapidly growing lithium-ion battery market. increase.

Our Technical Advisor, Mark Saxon (FAusMM), is a qualified person as defined by National Instrument 43-101 (Standards of Disclosure or Mineral Projects) and has prepared or prepared the scientific and technical information for this press release. I reviewed.

On behalf of the Board of Directors
Michael Dane
President, Chief Executive Officer and Director

For more information, please contact the following companies:
[email protected]
www.unitedlithiumcorp.com

About United Lithium

United Lithium Corp. (CSE: ULTH) is an exploration and development company driven by the global demand for lithium. We target lithium projects in politically safe jurisdictions with advanced infrastructure that enables rapid and cost-effective exploration, development and production opportunities.

Our consolidated financial statements and related management discussion and analysis are available on our website at https://unitedlithium.com/ or under the profile of SEDAR at www.sedar.com.

Forward-Looking Statements

This news release contains forward-looking statements that involve risks and uncertainties. All statements other than statements of historical fact are considered forward-looking. The Company provides forward-looking statements for the purpose of conveying information about its current expectations and plans for the future, and readers are cautioned that such statements may not be suitable for other purposes. please. By its nature, this information is subject to inherent risks and uncertainties, either general or specific, and any expectations, projections, projections, predictions or conclusions may not prove to be accurate, or assumptions may be incorrect. and its objectives, strategic goals and priorities will not be met. These risks and uncertainties include, but are not limited to, those identified and reported in our public filings under our SEDAR profile on www.sedar.com. Although we have attempted to identify important factors that could cause our actual actions, events or results to differ materially from those set forth in the forward-looking information, we do not anticipate any future actions, events or results. , estimates, or other factors that may cause it to differ from expectations. was intended. There can be no assurance that such information will prove to be accurate, as actual results or future events could differ materially from those anticipated in such statements. Unless otherwise indicated, we disclaim any intention or obligation to update or revise any forward-looking information, whether as a result of new information, future events or otherwise.

CSE does not take responsibility for the adequacy or accuracy of this release.


CBJ Newsmaker

United Lithium Corp. Begins Drilling at Kietyönmäki Lithium Project in Finland, Expands Land Position, The Canadian Business Journal

Source link United Lithium Corp. Begins Drilling at Kietyönmäki Lithium Project in Finland, Expands Land Position, The Canadian Business Journal

Related Articles

Back to top button